单项选择题
A. It cannot be managed because the application will not work properly with HACMP.
B. The application start and stop script for the application can manage the hostname.
C. HACMP will require customization to correctly manage a change in the hostname since it is tied to the primary network adapter.
D. HACMP will have to be restarted if the hostname is changed. This can be done with customization in the node_up and node_down event scripts.
单项选择题 An existing cluster has an application node and database node. Changes in the application require both nodes to have access to the other’s data all of the time. Which facility managed by HACMP can be implemented with the least amount of impact?()
单项选择题 Company.com is migrating from a third party managed disk subsystem to an IBM TotalStorage Enterprise Storage Server. Connection of the new storage server is complete, and it has been tested on all of the nodes in the three node HACMP cluster. How does the customer migrate to the new storage server with minimum down time?()
单项选择题 Company.comwithanEtherChannelimplementationisconsideringanHACMPsolution.Whatconsiderationsmustbeaddressedinplanningthisconfiguration?()