单项选择题
A. Shut down one node at a time and let the other node serve the application
B. Stop HACMP with the forced option and perform migration of the disks on one node,then restart HACMP
C. Stop both nodes and perform the migration all at once using standard AIX commands in parallel, then restart the cluster
D. Use C-SPOC to add the new disks to the cluster and migrate the information off the existing disks, then remove the old disks with C-SPOC
单项选择题 Company.comwithanEtherChannelimplementationisconsideringanHACMPsolution.Whatconsiderationsmustbeaddressedinplanningthisconfiguration?()
单项选择题 Continuous availability is required for an application in a two-node cluster. There is one rotating resource group in the cluster, and the nodes are identical machines. Client telnet connections to the application cannot be broken because it takes 20 to 30 minutes to recycle the client workstations and transactions will be lost. What configuration best provides continuous connectivity to the application?()
单项选择题 Company.com wishes to use IPAT via IP replacement in a two-node mutual cluster. Each node has two Ethernet 10/100/1000 adapters. Throughout the planning session,the customer has asked questions about subnet and VLAN requirements for the intended network topology. Which of the following best describes the network requirements?()