单项选择题
The account team designed a p5-570 solution to strategically position the customer for future IBM announcements. The customer was dissatisfied upon implementing the solution. An AIX v5.1 partition was added to the requirements halfway through the solution design process and it was not considered in the final design. What should the pSeries technical specialist have done to prevent this situation?()
A.Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570
B.Designed a p670 because it supports AIX 5.1 partitions
C.Initially designed a solution supporting AIX 5.1 partitions
D.Gained customer approval for the final design prior to ordering the system
相关考题
-
单项选择题
Ap5-5708-way32GBsystemhasbeenproposedtoacustomerasanewtestsystemwithfourLPARs.ThecurrentapplicationsarecertifiedonAIX5.2butnotyetonAIX5.3.Thecustomerwantstounderstandtheadvantagesanddisadvantagesofthissolutionversusapairof4-wayp5-550swith16GBeachintestingtheircurrentapplications.WhichofthefollowingpointsshouldthepSeriestechnicalspecialisthighlight?()
A.The p5-570 would save rack space over a pair of p5-550 servers.
B.The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.
C.The p5-570 can only be upgraded to 64GB of RAM without replacing memory.
D.The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters. -
单项选择题
AcustomerisdebatingwhethertouseSharedEthernetversusVirtualEthernet.WhichofthefollowingbestdescribesakeydifferencebetweenSharedandVirtualEthernet?()
A.Shared Ethernet runs on POWER4 systems
B.Virtual Ethernet runs on POWER4 systems
C.Shared Ethernet requires a Virtual I/O server and Advanced Power Virtualization
D.Virtual Ethernet requires a Virtual I/O server and Advanced Power Virtualization -
单项选择题
AcustomerneedsaverysmallAIXsystemtoruntheirnewapplicationandisconsideringa1-wayp615.WhatkeyinformationshouldthepSeriestechnicalspecialistprovidetothecustomer?()
A.The 1-way p615 cannot be upgraded to a 2-way p615.
B.The 1-way p615 can be upgraded to a 2-way p615 should additional capacity be required.
C.The p615 can be upgraded to a POWER5-based processor.
D.The p615 is not a good solution, as it does not take advantage of the Advanced POWER Virtualization features.