A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570. If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()
A.The p5-570 is rack mounted but the p5-550 is not.
B.The p5-570 will provide more growth, but at a higher cost.
C.The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.
D.The p5-570 needs a special feature to become a deskside machine.
相关考题
-
单项选择题
WhichofthefollowingfeaturessetsIBMapartfromcompetitorsintheareaofpartitioning?()
A.Software support
B.Hardware isolation
C.Static changes in partitions
D.Micro-Partitioning -
单项选择题
A pSeries technical specialist has completed a server consolidation study of a customer’s environment. An LPAR worksheet was produced, which details the resource (CPU, memory, disk, adapters) requirements for each OS image (partition) based on workload. What is the most appropriate next step?()
A.Update Siebel to include the study results.
B.Review the study results and LPAR worksheet with the customer.
C.Design detailed system configurations around the study results.
D.Work with the client executive and the brand manager to establish discounts. -
单项选择题
A customer is looking for a reliable well-performing, cost-effective solution to a growing commercial workload. Initially, they want to run 12 UDB partitions, each of which would need two processors and 8GB of memory. They are looking at the p655 and want to start with three LPARS on each p655 node using a total of four nodes. Each LPAR would need at least 4 x 6239 fibre cards and 2 x 5706 2-port 10/100/1000 Ethernet cards. At a later date, they want to add an additional LPAR to each node to expand to a total of 16 UDB partitions. Which of the following major limitations of this solution should be mentioned to the customer?()
A.The p655 supports only two LPARs.
B.The p655 supports only four LPARs.
C.There are not enough available slots for three LPARs.
D.There are not enough available slots for four LPARs.