单项选择题
The Chief Information Officer (CIO) is preparing a briefing about the reliability of their server environment. There is a need to create a report about which systems had unplanned system outages and how often they occurred. What IBM Director tool can be used to create the report?()
A.Capacity Manager
B.Process Management tool
C.System Availability tool
D.System Reporting tool
相关考题
-
多项选择题
Acustomerhasjustpurchasedsixx346serversrunningWindows2003WebEdition.Theyareexpectingtoaddsixadditionalx346’sinthreemonths.Theyhavearequirementtoautomaticallydeploythecurrentserverimageuponthenewservers.WhatTWOactionsarerequiredtocompletethistask?()
A.Ensure Director Agent is installed on the new servers.
B.Ensure a DHCP Sever is installed and configured in the environment.
C.Ensure Server Plus Pack option has been installed and configured.
D.Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.
E.Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created. -
单项选择题
AcustomerwantstodeployVMWareESXonfour-wayIntelsystems.TheyareconsideringIBMandDell.WhichofthefollowingisanadvantageIBMhasoverthecompetition?()
A.IBM provides optional Remote Technical Support for hardware, NOS, and VMWare.
B.The IBM xSeries EXA chipset has extensions to provide better efficiency for the VMFS file system.
C.IBM servers can address larger LUNs on SAN storage than Dell.
D.IBM provided VMWare with the majority of their internal drivers for ESX. -
单项选择题
AcustomerusesanIBMxSeriesx366fortheirnetworkserver.TheyexperienceddowntimewhentheNICfailedearlierthisyear.TheirNovell6.5serverneedstobeaccessibleallthetimeatthehighestspeedpossible.Slotsareavailablewherenetworkadapterscanstillbeadded.Highavailabilityistheprimaryrequirement,butincreasednetworkbandwidthontheserverisalsorequired.Whichofthefollowingisthemostcost-effectivesolutiontosatisfyallofthecustomer’srequirements?()
A.Upgrade the network switches to 10Gb speed.
B.Install a dual port gigabit Ethernet adapter and configure adapter load balancing teaming with the onboard adapters.
C.Install one extra adapter to team with the internal adapter and configure adapter failover.
D.Install two additional NICs and configure adapter load balancing teaming with the onboard adapters.
