单项选择题
The IBM Systems & Technology value proposition is built on: ()
A.Realize Innovation, Manage Growth Complexity and Risk, Go Green and Save
B.Collaboration, Virtualization, and Ecosystem
C.Innovation, Collaboration, and On-Demand
D.Openness, On-Demand, and Green
相关考题
-
单项选择题
The CIO of a research and technology company recently sent an email outlining his organization’s Information Technology plans for the next 12 to 18 months. He asked for proposals that satisfied the following requirements: --Recommend an Opteron AMD server capable of running as a 3-way but can be upgraded to a 4-way server. --Recommend a four (4) way Intel Dual core 3.5GHz Sever capable of being upgraded to a 16 way server. What servers would you propose?()
A.IBM x3755 and IBM x3850
B.IBM x3650 and IBM LS41 Blade
C.IBM x3655 and IBM x3650
D.IBM x3755 and IBM x3950 -
单项选择题
CIOs and their staff have very little experience architecting or designing solutions to support unknown workloads. As executives focus on compliance issues, more systems must be architected to align with emerging or poorly defined requirements. If the customer prefers an integrated solution physically consolidated in a scalable, single framework that can connect to an enterprise class storage area network, what solution would you recommend?()
A.Multiple 1U and 2U servers equipped with FC HBAs to connect to the enterprise SAN
B.Single 3U/4U servers expandable to 32-way equipped with FC HBAs to connect to the enterprise SAN
C.BladeCenter, expandable to 14 blades equipped with FC HBAs, and redundant 20-port FC SAN Switch modules to connect to enterprise SAN
D.IBM 1350 Cluster equipped with FC HBAs to connect to enterprise SAN -
单项选择题
A customer is concerned about the high energy cost associated with their data center. Specifically, their concern focuses on the cooling cost of many hundreds of servers. You have a meeting with the CIO and CFO to propose a solution. How would you prepare yourself for the meeting? ()
A.Since their capacities and usage models vary, ask the customer to turn off some of the servers during off-peak and low demand time.
B.Investigate their expansion plans and suggest to the customer the removal of some of their servers to another location and retirement of the older servers.
C.Contact the CFO to find out the targeted energy savings of the company and propose to the customer the purchase of a more efficient cooling system.
D.Contact the CIO for a list of servers and type/model numbers. Complete a proposal outlining the savings on energy cost by deploying an IBM BladeCenter solution and total cost of ownership and return on investment.
