单项选择题
A company needs to connect seven of their Windows-based servers to a DS4000 storage server. The DS4000 only has two host-side connections, and each server has two HBAs. Which of the following is the lowest cost solution to provide no single points of failure?()
A.Implement two 8-port switches design with ISLs
B.Implement two 16-port switches design with ISLs
C.Implement two 8-port switches design without ISLs
D.Implement two 16-port switches design without ISLs
相关考题
-
单项选择题
AcustomerisrunninganumberofHPIntelserverswithinanIBMmanagementenvironment.TheHPInsightManageragentisalreadyinstalled,buttheydonotwanttoinstalltheDirectoragentbecauseofpotentialconflicts.IntowhichsystemaretheMIBfilescompiled?()
A.On the HP managed server
B.On the IBM Director server
C.On the IBM Director Jet database
D.In the IBM Director database -
单项选择题
AcustomerhasalargeHPIntelinfrastructureandisactivelymanagingtheseserverswithInsightManager.TheyrecentlypurchasedanIBMx346serverforaremoteofficedatabaseproject.TheydonotwanttorunadditionalsystemsmanagementsoftwarebutrequiretobenotifiedofPFAandhardwarealertingoncriticalhardwarecomponents.Whichofthefollowingsolutionswouldaccomplishthis?()
A.Install an RSA II Slimline card on the IBM server and configure to send email alerts
B.Enable the IBM management option in Insight Manager
C.Install and configure a Director agent on the IBM server
D.Configure the systems management processor on the IBM server -
多项选择题
Acustomerrunsanapplicationonasupported8-wayx445.Thecustomerneedstomonitoroperationsandwantstobealertedwhenproblemsarise.WhichTWOofthefollowingcanbeconfiguredinIBMDirectorBasePacktomonitorthecustomer’soperations?()
A.Fan operation
B.Bottleneck analysis
C.Power supply operations
D.Planned versus unplanned outages
E.Application predictive failure analysis