单项选择题
A client’s CIO validates that IBM proposed virtualization/consolidation solution addresses their key pain points. However, the CFO is more concerned with risk mitigation as a result of the new economic environment and has delayed the deal indefinitely. Which of the following strategies is the best way to address this situation?()
A.Modify the deployment schedule of the solution over an extended period of time to reduce the initial cash outlay.
B.Gain the CFO’s agreement to revisit the solution next quarter and follow-up with an aggressively priced solution.
C.Present financing options to the CFO showing how to implement the solution while minimizing the monthly cash outlay.
D.Meet with the CFO to demonstrate the financial impact of the solution to reduce operational expenses and TCO
相关考题
-
单项选择题
A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: (1)two Brocade 20-Port SAN Switch Modules (2)two Nortel Networks 1/10 GB Uplink ESM (3)a redundant AMM What is the minimum number of power supplies needed for this configuration to have full redundancy?()
A.4
B.3
C.2
D.8 -
单项选择题
AretailcustomerinstallsaBladeCenterintoanexisting10/100Ethernetnetwork.Duetocostconsiderations,thecustomerusesCopperPass-thruModules.Afterinstallingthissolution,thecustomerfindsthattheyhavenonetworkconnectivity.Whichiscausingtheproblemofthefollowing?()
A.Copper Pass-thru Modules only support 1000Mb line speeds.
B.Spanning Tree has been enabled on the Copper Pass-thru Module.
C.The customer does not have the latest firmware loaded on the Copper Pass-thru Module.
D.The customer is using LS21 Blades -
单项选择题
AcustomeraskswhichbaystheycouldinstallMulti-SwitchInterconnectModule(MSIM).Whichisthesourceofthisinformationofthefollowing?()
A.CDAT
B.IBM Systems Director
C.Tivoli Provisioning Manager (TPM)
D.xREF
