单项选择题
During Company.com planning session,Company.com presents the details of the current Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required.
Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()
A. 4
B. 5
C. 6
D. 8
相关考题
-
单项选择题
An HACMP cluster is planned for two logical partitions on IBM p690 servers. Both partitions have three network interface adapters: two service adapters on a production network connected to an IP switch, and an administration adapter on a stand-alone hub that is connected to the p690 server’s HMC. Non-IP hearbeat paths cannot be configured due to the available hardware in the p690 servers. Given the resources available,what is the best configuration for this cluster?()
A. Add hardware to provide either serial heartbeats or shared disk heartbeats.
B. Define the administration network so HACMP will send heartb4eats over the non-routed network.
C. Add the administration network adapters to the production resource groups with IPAT via IP replacement selections.
D. Configure the IP Network Interface Module in HACMP with an increased heartbeat detection rate to prevent node isolation confutations. -
单项选择题
Whatmustbedonetomakeasharedtapedrivehighlyavailable?()
A. Ensure the rmt numbers are unique per node.
B. Nothing,because HACMP manages the state of the tape drive.
C. Nothing,because highly available tape devices are not supported.
D. Ensure that the tape device is in a defined state after system startup. -
单项选择题
During initial cluster planning session, a requirement is mandated that application monitoring will Be used to monitor the production database and three application servers. Since all the application servers rely on the database being active, only one resource group has been planned to manage the starting/stopping of the cluster resources. How ill the initial design impact the use of application monitoring?()
A. Only one application server per resource group can be monitored.
B. Process monitoring is part of RSCT and requires no special scripts.
C. Any application can be monitored as long as it has an application server.
D. Having all application servers in one resource group improves recovery time.