单项选择题
During port state control inspection, if one generator is out of commission, ()should investigate whether power is available and conduct tests.
A.the third engineer
B.the PSCO
C.the surveyor
D.the chief engineer
点击查看答案&解析
相关考题
-
单项选择题
During inspection of the machinery space, which of the following statements points to an unsatisfactory organization of the systematic maintenance?()
A.missing valve hand wheels
B.dirty tank tops
C.a large number of temporary repairs
D.All of the above -
单项选择题
When the PSCO would like to witness a fire drill carried out by the crew, he should consult ()to locate a simulated fire.
A.the manager of the company
B.the surveyor of the Classification Society
C.the master of the vessel
D.the chief engineer of the vessel -
单项选择题
The PSCO would be justified in making a detailed inspection of all life-saving appliances, if he sees that ().
A.the survival craft launching equipment have never been used
B.the pivot points are seized
C.the lashing or stowing of deck cargo is improper
D.All of the above signs are evident