单项选择题
A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel:
(1)four 4-socket Microsoft SQL servers with two hot swap SAS drives
(2)two physical Microsoft Active Directory Servers
(3)twenty-two physical Citrix servers
(4)three physical Web servers
(5)one physical vCenter server
(6)eight vSphere hosts
Which configuration minimally satisfies these requirements?()
A.Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules
B.Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules
C.Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules
D.Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
相关考题
-
单项选择题
AcustomerrequiresaninfrastructuretosupportdisasterrecoveryofcriticalapplicationsbetweentworemotedatacentersoneinTokyoandoneinBeijing.Thecustomer’sRecoveryPointObjective(RPO)necessitatesasix-hourwindowforabandwidthof100MB/sandanewStorageSystemforatotalof4TBofdata.Theyestimate100MBofnewdataproducedhourly.Whatdatasynchronizationmethodwouldberecommendedtomeettherequirements?()
A.Metro Mirror
B.Flashcopy
C.Global Mirror
D.Snapshot -
单项选择题
AcustomerisconsideringiDataPlexandseveralcompetitivesolutions.WhichfavoriDataPlexofthefollowing?()
A.Usable density
B.Lowest cost of acquisition
C.Flexible configurations ready for integration and testing at the customer location
D.Standard rack mounting -
单项选择题
Whensellingagainstcompetition,whichfocusontheiDataPlexvaluepropositionofthefollowing?()
A.Superior chip density
B.Balance performance, cost, and power and cooling efficiency
C.Flexible configurations ready for integration and testing at the customer location
D.Standard rack mounting
