单项选择题
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions.
What is needed to read the exported system plan and design the new system?()
A.e-Config
B.System Planning Tool (SPT)
C.IBM Workload Estimator (WLE)
D.IBM Performance Monitor (PM)
相关考题
-
单项选择题
Acustomerwouldliketocreateasharedprocessorpartitionwith16virtualprocessors.Whatistheminimum numberofprocessingunitsrequiredinthepartitionprofile?()
A.0.80
B.0.16
C.1.60
D.0.10 -
单项选择题
WhichdatasynchronizationoptionsbetweentwogeographicallocationsaresupportedbyPowerHA SystemMirror?()
A.Parallel and Serial
B.Serial and Asynchronous
C.Parallel and Synchronous
D.Synchronous and Asynchronous -
单项选择题
A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()
A.Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs
B.Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.
C.Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.
D.Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.