单项选择题
A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.
Which IBM BladeCenter Chassis should be recommended? ()
A.BladeCenter E
B.BladeCenter H
C.BladeCenter T
D.BladeCenter HT
点击查看答案
相关考题
-
单项选择题
An SMB customer requires a tower server with 2TB of internal storage. The customer has requested a low cost solution. What IBM System x server would satisfy this criteria?()
A.x3250
B.x3200
C.x3650
D.x3400 -
单项选择题
A customer has asked the System x Sales Specialist to provide a solution that meets the following requirements: -- 4U rack-dense server -- 4 quad-core processors -- 32 GB of memory -- 4 Internal SAS hard drives with RAID 5 support -- Redundant Power Supplies -- 7 PCI-E slots available A competitor presented the customer with a solution comparable to a Dell PowerEdge 4-socket server. Which of the following should the System x Sales Specialist present as an advantage over the competitor’s solution? ()
A.x3255
B.x3655
C.x3755
D.x3850 M2 -
单项选择题
It takes a comprehensive strategy to grow data center capabilities while containing power and cooling costs. Which IBM thermal environment solution can best support this strategy with no effect on performance? ()
A.IBM Rear Door Heat eXchanger
B.IBM Active Energy Manager
C.IBM Calibrated Vector Cooling
D.All of the above