单项选择题
When deciding the composition of the engineering watch, which may include appropriately qualified ratings, following criteria shall be taken into account()
Ⅰ.the type of ship
Ⅱ.the type and condition of the machinery
Ⅲ.the safety of life, ship, cargo and port
Ⅳ.the observance of international, national and local regulations
A.Ⅰ+Ⅱ
B.Ⅱ+Ⅲ
C.Ⅱ+Ⅲ+Ⅳ
D.Ⅰ+Ⅱ+Ⅲ+Ⅳ
点击查看答案&解析
相关考题
-
单项选择题
When deciding the composition of the engineering watch, which may include appropriately, many factors shall be taken into account().
A.satisfied engineers
B.qualified ratings
C.satisfied chief engineer
D.qualified chief engineer -
单项选择题
STCW78/95 states that the office in charge of the engineering watch is the representative ().
A.ship-owner’s
B.master’s
C.chief engineer’s
D.manager’s -
单项选择题
“Inability to provide for the first watch at the commencement of a voyage and for subsequent relieving watches persons who are sufficiently rested and otherwise fit for duty” is considered to be one of the detainable deficiencies under ().
A.the SOLAS Convention
B.the MARPOL Convention
C.the STCW Convention
D.the LIAD LINE Convention
