欢迎来到建筑考试题库网 建筑考试题库官网
全部科目 > Oracle认证考试 > 1Z0-060

多项选择题

You notice that the elapsed time for an important database scheduler Job is unacceptably long.
The job belongs to a scheduler job class and window.
Which two actions would reduce the job's elapsed time?()

    A. Increasing the priority of the job class to which the job belongs
    B. Increasing the job's relative priority within the Job class to which it belongs
    C. Increasing the resource allocation for the consumer group mapped to the scheduler job's job class within the plan mapped to the scheduler window
    D. Moving the job to an existing higher priority scheduler window with the same schedule and duration
    E. Increasing the value of the JOB_QUEUE_PROCESSES parameter
    F. Increasing the priority of the scheduler window to which the job belongs

点击查看答案

相关考题

微信小程序免费搜题
微信扫一扫,加关注免费搜题

微信扫一扫,加关注免费搜题