单项选择题
Your company has an Active Directory forest.
The forest contains two sites named Site1 and Site2.
You plan to deploy Exchange Server 2010 servers in both sites.
You need to plan a high-availability solution for the Mailbox servers that meets the following requirements:
.Users must be able to access their mailboxes if a single server fails
.Users must be able to access their mailboxes remotely if a single site becomes unavailable
What should you do?()
A.Deploy two Mailbox servers in each site. Install and configure continuous cluster replication (CCR).
B.Deploy one Mailbox server in Site1 and one Mailbox server in Site2. Install and configure continuous cluster replication (CCR).
C.Deploy two Mailbox servers in each site. Create one database availability group (DAG) named DAG1. Add all Mailbox servers to DAG1.
D.Deploy two Mailbox servers in each site. Create two database availability groups (DAGs) named DAG1 and DAG2.Add the Mailbox servers from Site1 to DAG1 and the Mailbox servers from Site2 to DAG2.
相关考题
-
单项选择题
Your network consists of a single Active Directory site. You plan to deploy Exchange Server 2010. You need to plan the deployment of Exchange Server 2010 servers to meet the following requirements:.All Mailbox servers must belong to a database availability group (DAG) .MAPI connections from Outlook clients must be load balanced by using a hardware load balancer .If a single server fails, users must continue to send and receive e-mail .The plan must minimize the number of servers deployed What should you include in the plan?()
A.Deploy two servers. On the two servers, deploy the Mailbox server role, the Client Access server role, and the HubTransport server role. Configure a Client Access server array.
B.Deploy two servers. On the two servers, deploy the Mailbox server role, the Client Access Server role, and the HubTransport server role. Enable Outlook Anywhere on both Client Access servers.
C.Deploy four servers. On two of the servers, deploy the Mailbox server role and the Hub Transport server role. On the other two servers, deploy the Client Access server role. Configure a Client Access server array.
D.Deploy four servers. On two of the servers, deploy the Mailbox server role. On the other two servers,deploy the Client Access server role and the Hub Transport server role. Enable Outlook Anywhere on both Client Access servers. -
单项选择题
Your company has two data centers. Each data center contains a perimeter network. Your network contains an Exchange Server 2010 organization. You plan to deploy Exchange Server 2010 Edge Transport servers in the perimeter networks. You need to recommend a solution for the Edge Transport servers that meets the following requirements:.Distribute inbound e-mail messages across all Edge Transport servers .Ensure that users receive inbound e-mail messages if an Edge Transport server fails .Ensure that users receive inbound e-mail messages if a single data center network becomes unavailable.Minimize costs What should you recommend?()
A.In each perimeter network, deploy one Edge Transport server. Implement failover clustering.
B.In each perimeter network, deploy two Edge Transport servers. Implement failover clustering.
C.In each perimeter network, deploy one Edge Transport server. Configure a mail exchange (MX) record for each server.
D.In each perimeter network, deploy two Edge Transport servers. Configure a mail exchange (MX) record for each server. -
单项选择题
You have an Exchange Server 2010 organization. You need to recommend a client access solution that meets the following requirements: .Reduces the time required for users to reconnect to user mailboxes if a single Client Access server fails .Prevents users from being prompted for authentication if a single Client Access server fails What should you recommend?()
A.Client Access server array and hardware load-balancer
B.database availability group (DAG) and hardware load-balancer
C.failover clustering and database availability group (DAG)
D.Windows Network Load Balancing and failover clustering
