A.One 7311-D20 drawer
B.Two 7311-D20 drawers
C.Two 7311-D10 drawers
D.One 7311-D10 drawers
单项选择题 AcustomerisgettingreadytoinstallanewpSeriessystemintotheirdatacenter.Theyareconcernedaboutprovidingtheappropriateclearancearoundtheir7014-T42toallowformaintenance.WhatreferencematerialshouldthepSeriestechnicalspecialistprovidetothecustomer?()
单项选择题 Acustomerhasan8-wayp5-570witheightinternaldiskdrivesandAIX5.2.Whichofthefollowingmustbeadded,ifanything,totheconfigurationtosupportfourLPARs,assumingeachLPARrequirestwodiskdrives?()
单项选择题 A customer is considering multiple options for a particular set of workloads on AIX v5.2. They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks. They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue. They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()