black

IBM(000-104)

登录

单项选择题

A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system.
Which would be the most critical option to mitigate AIX availability?()

A.Dual power supplies.
B.Twice the amount of disk.
C.Two dual-port LHEA adapters.
D.Two dual-port fibre channel adapters.

相关考题

单项选择题 Which of the following is a situation where dual (redundant) HMCs are recommended?()

单项选择题 Where will an administrator find documents in PDFformat that include detailed architecture and step-by-step installation instructions for Power servers?()

单项选择题 An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()

All Rights Reserved 版权所有©建筑考试题库(jzkao.com)

备案号:湘ICP备2020024380号-3