单项选择题
A.The I/O workload needs of the client LPARs
B.The processing requirements of the client LPARs
C.The memory requirements of the client LPARs
D.The virtual Ethernet requirements between client LPARs
单项选择题 What is the correct sequence to set up a Virtual I/O Server?() 1.Boot to SMS 2.Create the VIOS partition 3.Install VIOS software 4.Accept license
单项选择题 Company.com has a VIO server with a configured virtual Ethernet adapter and a physical Ethernet adapter with an IP address on their local public network. They want to re-configure the physical Ethernet adapter as Shared Ethernet Adapter. When the mkvdev command is run, the following method error is returned: /usr/lib/methods/cfgsea . Which of the following will most likely resolve the problem?()
单项选择题 A system administrator is deploying a new POWER5 server. The application requires AIX 5L V5.2. Which of the following virtualization technologies can be used?()