单项选择题
A. There is not an adequate solution because HACMP should not be configured in this environment without a dedicated standby node.
B. Nodes ’A’ and ’B’ should be configured in a cluster with mutual fallover of two cascading resource groups to provide both nodes will deliver acceptable response time with both resource groups.
C. Nodes ’A’ and ’C’ should be configured in one cluster, and Nodes ’B’ and ’C’ in another cluster to prevent both the database and application server from falling over to Node ’C’ at the same time.
D. Nodes ’A’, ’B’, and ’C’ should be configured in a cluster with Node ’C’ the hot standby for both the database and application server resource groups. Workload Manager (WLM) must be configured on database and application developers from over utilizing the CPU resources.
单项选择题 During a planning session, Company.com expresses concern about the behavior of the nodes When HACMP is installed. Once department is reliant on an older piece of equipment that is critical to operations and must communicate to the database server. Previous network changes indicated that this piece of equipment does not support gratuitous ARP. How can HACMP best incorporate this restriction into the cluster design?()
单项选择题 Company.comhasanapplicationthatrequiresaserialconnectionforElectronicDataInterchange.WhatmustbedonetointegratortheserialconnectionintoanHACMPcluster?()
单项选择题 Company.com has a new computer room that will be used to house a new HACMP cluster. Onceof the outstanding features of the new computer room was the new large air conditioner. This unit has enough excess capacity for more than double the planned amount of equipment. Another feature of this computer room was the dual electric supplies to the room housed in two separate power panels. How would this impact the overall availability of the environment?()