单项选择题
Cargo for ()No.4 is to be loaded first.
A.room B.cabin C.hold D.winch
单项选择题 Bolts, nuts, split pins, hinges, wheels and stoppers should be frequently ().
单项选择题 Before opening and closing the hatches, the spaces around the covers, all the parts and the gears should be ().
单项选择题 The foreman said three ()would come on board to load cargo.