单项选择题
A.Change all IP site links to SMTP site links.
B.Modify the Exchange-specific cost for each site link.
C.From the Hub Transport servers in each site, create a journal rule.
D.From the Hub Transport servers in each site, create a transport rule.
单项选择题 You have an Exchange Server 2010 organization. The network contains an Exchange Server 2010 Mailbox server named Server1. All mailboxes are stored on Server1. You perform a Typical installation of Exchange Server 2010 on a new server named Server2. You plan to implement redundancy for mailbox access. You need to recommend a solution that ensures that client computers can reconnect to their mailboxwithin five minutes if Server1 fails. What should you recommend?()
单项选择题 Your company has an Active Directory forest. The forest contains two sites named Site1 and Site2. You plan to deploy Exchange Server 2010 servers in both sites. You need to plan a high-availability solution for the Mailbox servers that meets the following requirements: .Users must be able to access their mailboxes if a single server fails .Users must be able to access their mailboxes remotely if a single site becomes unavailable What should you do?()
单项选择题 Your network consists of a single Active Directory site. You plan to deploy Exchange Server 2010. You need to plan the deployment of Exchange Server 2010 servers to meet the following requirements:.All Mailbox servers must belong to a database availability group (DAG) .MAPI connections from Outlook clients must be load balanced by using a hardware load balancer .If a single server fails, users must continue to send and receive e-mail .The plan must minimize the number of servers deployed What should you include in the plan?()